SSEN main rating fuse wont help

These are the pictures I submitted to the Wallbox installer

Old is prior to the upgrades, the switch box on the right is required as the house consumer unit is more than 5m (run length) away from the meter. New has the new consumer unit on the left, the Henley block (brown box just below the meter) splits the meter tails to the two consumer units and the new control box to the right of the meter with the new earth in between.

The Wallbox is essentially on the outside of wall behind the switch box so about a meter away from the dedicated CU.
 
Sorry, Site having problems uploading files?

New.jpg
Old.jpg
 
That's the finished job it's used to be a loop supply
The missing cable used to supply my neighbour and they got given a new supply
Screenshot_20220618_183411.jpg
 
Last edited:
All work was free with ovo and UK power networks ?
 
Support us by becoming a Premium Member

Latest MG EVs video

MG Hybrid+ EVs OVER-REVVING & more owner feedback
Subscribe to our YouTube channel
Back
Top Bottom