Had my charger installed at an eye watering price it should have had a ct clamp and load limiting according to paper work (wasn’t overly bothered as it’s done dead of night only - not hitting the limits). Been nearly a year since the unloop request. Next door works for the DNO but not on overhead supplies so is jiggling it on his side apparently. How long should I wait before kicking off ?
Next as the installer never fitted the clamp, I can’t hoover up spare solar properly (not getting paid for export yet) so figured I’d chase it up. I think installer was lazy. How in trouble would they get if I have any issue with them not doing it ?