After applying to have an EV wall charger fitted I've finally got an instillation date just over two months after accepting the quote. It would have been sooner but it was discovered the meter and main supply was attached to an asbestos backing board. I then had to arrange and pay £120 for the board to be tested to determine the type of asbestos and wait for a specialist team to be arranged. While they are at it they are going to fit smart meters too.