GaryMG4
Established Member
- Joined
- May 23, 2023
- Messages
- 499
- Reaction score
- 524
- Points
- 176
- Location
- Kings Lynn
- Driving
- MG4 Trophy LR
Just got back from a visit to North York Moors, did a total of 475 mile over 4 days with no issues. On the way there I charged at MFG Pickering, no problems took a few days to clear the £40 hold, didn't need to stop there as the chargers in Pickering had been upgraded to 75kW - zap map still had them as 50kW.
Really enjoyed the moorland roads, 1 in 4 and 1 in 3 hills a breeze going up or down, Regen did all the work going down most of the time. The cottage owner was happy to let me used their electricity at cost, he even had a 32amp commando outlet with 3 pin socket attached, shame I didn't have a 7.4kW charger I could plug in.
Stopped at Blythe on the way back for comfort break, decided to try the Gridserve there as Ive not used them yet, again no problems, 11 free Tesla chargers and 5 Gridserve free. Had a chat with a lad delivering a Corsa-e who had been there an hour trying to get to 100% that he would be better charging to 60-70% and then stopping again.
Considering the hills and a lot of 70mph motorway driving I'm happy with the 3.7miles/kWh for the trip.
Really enjoyed the moorland roads, 1 in 4 and 1 in 3 hills a breeze going up or down, Regen did all the work going down most of the time. The cottage owner was happy to let me used their electricity at cost, he even had a 32amp commando outlet with 3 pin socket attached, shame I didn't have a 7.4kW charger I could plug in.
Stopped at Blythe on the way back for comfort break, decided to try the Gridserve there as Ive not used them yet, again no problems, 11 free Tesla chargers and 5 Gridserve free. Had a chat with a lad delivering a Corsa-e who had been there an hour trying to get to 100% that he would be better charging to 60-70% and then stopping again.
Considering the hills and a lot of 70mph motorway driving I'm happy with the 3.7miles/kWh for the trip.