siteguru
Distinguished Member
- Joined
- Sep 3, 2022
- Messages
- 9,208
- Solutions
- 3
- Reaction score
- 12,172
- Points
- 3,499
- Location
- Strathaven
- Driving
- MG4 SE SR
Original Trophy did indeed charge at up to 7kW from a 7.4kW single phase supply, as it linked 2 of the 3-phase onboard charger units when only a single phase supply was detected. 
