Lambiek V
Novice Member
I bought a smart charge station from Zonneplan for my MG ZS EV 2020.
The station should give me the ability to start a scheduled load session let’s say after two hours.
So I scheduled, connected the cable and closed the doors.
After waiting two hours unfortunately nothing happened at the scheduled start time.
Has anyone the same kind of issues and/or the solution ?
Thanks, Lambert.
The station should give me the ability to start a scheduled load session let’s say after two hours.
So I scheduled, connected the cable and closed the doors.
After waiting two hours unfortunately nothing happened at the scheduled start time.
Has anyone the same kind of issues and/or the solution ?
Thanks, Lambert.
Last edited by a moderator: