Thanks again Frank. Yes I have solar panels and nearly 2 years ago had iberdrola install a charging point for an electric car, long story, short, as I have said, didn't buy an ev. I had many problems and still have, trying to obtain the grant, Moves 3. When I purchased the station, I led to believe that Iberdrola would complete the application but then was told to ho on line and complet. I started to do this, which meant uploading various documents, then iberdrola changed the web site and I was totally confused. It took me months to get Iberdrola to help me. I even had to write to their Director to get action. The application is still proceeding almost one and a half years down the line.
This does not feel me with confidence in buying a car with Moves 3.