I have read on the MG ZS forum member order tracker post no EV's on the DRIVE GREEN HIGHWAY or NEPTUNE ACE. How true I dont know.Thanks Ozzie.
drive green highway…13th April. (Not long now)
Iguazu highway…21st April
Neptune Ace…18th April
any idea how long it takes to unload? Any idea how long it takes for the dealership to ready the car..
Do you feel lucky?..
We now have 140+ entries on spreadsheet, I just hope anyone receiving their order
don't get carried away with it and forget to leave an update message.
My dealer advised that there were no EV's on the DRIVE GREEN HIGHWAY or
NEPTUNE ACE so I would love to hear different.
My dealer said no cars coming in April nor May, next shipment is at least 8 weeks away, which is believable.I have read on the MG ZS forum member order tracker post no EV's on the DRIVE GREEN HIGHWAY or NEPTUNE ACE. How true I dont know.
So, not very lucky then.I have read on the MG ZS forum member order tracker post no EV's on the DRIVE GREEN HIGHWAY or NEPTUNE ACE. How true I dont know.
My September delivery seems optimistic now, considering theres folks still awaiting orders from Nov (mine was Jan).The next big one will probably be 29th may
VIKING Adventure it done well last visit
That’s where my car’s coming from…disappointing news then - guessing my car wasn’t one of those! Hahah!We were rather impressed with the 15+ MG ZS EVs sitting on the Cinderford MG forecourt awaiting PDI when we were test driving during March.
My order was October 19 and no car till August that’s what MG sayMy September delivery seems optimistic now, considering theres folks still awaiting orders from Nov (mine was Jan).
You must be one of the longest waiting, I ordered beginning of November, I still don’t have a built date, never mind a delivery date. I don’t understand, how when I ordered in November I don’t have a built date, but people who ordered after me have delivery dates. May be these dates are to keep people happy??My order was October 19 and no car till August that’s what MG say
I am in the same boat (no pun). I ordered Nov too, and car not built yet. I wonder if most of the MG ZS cars that are here are SR not LR as MG had a stock built before the launch of that model; so some were ready. I know there are one or two LR's about, some dealer demos and one or two that have actually been built for customers. I am fairly sure the dealers know very little and only get three dates from MG that they can rely on, namely, built, shipped, and a landed. The ETA dates are simply 4 months from now and until a built date pops up it is largely conjecture. Congrats if you have one, they do exist, and for the rest it is a waiting game. There is a good order tracker thread.You must be one of the longest waiting, I ordered beginning of November, I still don’t have a built date, never mind a delivery date. I don’t understand, how when I ordered in November I don’t have a built date, but people who ordered after me have delivery dates. May be these dates are to keep people happy??
I think it was more of a pressure from the Indian government to manufacture in India than to relieve stress from MG's factories.I'm intrigued that local assembly is an option these days, but I guess it relieves the pressure from the main MG factories. Is the Indian assembly largely automated do you know?
??This doesn't sound good!
![]()
Global microchip shortage will fester into 2024, VW CFO says
Semiconductor supplies will not normalize worldwide until 2024, by which time there will still be a structural undersupply, VW Group CFO Arno Antlitz said.www.autonews.com
That's mainly a European problem, not sure how it effects Saic as they are said to be starting producing their own semi-conductors ?