So deposits have been paid, for the building and solar installer.
Solar installer will be doing the building electrics too so that's one less tradesman I needed to find and avoids any "they did this wrong, you'll have to get them back in"
PV will be 12 x 390W JA Solar panels, Solis hybrid inverter and 2 x 5KwH Puredrive DC batteries.
Given a build date for end of July so I should, hopefully, be back with some production figures beginning of August.
Part of me keeps thinking it would be a good idea to have more battery storage, as winter production is going to be poor, but the rational part tells me to wait and see how poor it is.