I visited Glasgow Fort today, just off the M8 near Glasgow (it’s not very imaginatively named!!)
Anyway, there are the usually variety of retail stores, places to eat, a gym and a cinema. And out of the 2,500 car parking spaces there are four EV charging bays. And these aren’t your common or garden 22kW AC. Nor are they even 7kW bays. No, these are two dual PodPoint units delivering 3kW per port. And only three are working.
I arrived and all three were in use - checked again after breakfast and two were available so I plugged in and went to the cinema. When leaving, all four bays were busy - a Leaf charging, a big Audi on the non-working connection, a BMW 3-Series plugged in but probably hadn’t activated charge before 15 minute limit so wasn’t charging - and me. A Tesla M3 popped on when I left.
So, 2,500 spaces and 3 x 3kW connections. And lots and lots of retail parks are similar. This place needs 40, if not 100 7kW connections. Even that would only be 4% of spaces. Given a movie visit lasts 2+ hours, even 100 connections isn’t a lot. I’ve personally no need for 50kW+ units at these locations but loads of 7kW makes sense.
Anyway, there are the usually variety of retail stores, places to eat, a gym and a cinema. And out of the 2,500 car parking spaces there are four EV charging bays. And these aren’t your common or garden 22kW AC. Nor are they even 7kW bays. No, these are two dual PodPoint units delivering 3kW per port. And only three are working.
I arrived and all three were in use - checked again after breakfast and two were available so I plugged in and went to the cinema. When leaving, all four bays were busy - a Leaf charging, a big Audi on the non-working connection, a BMW 3-Series plugged in but probably hadn’t activated charge before 15 minute limit so wasn’t charging - and me. A Tesla M3 popped on when I left.
So, 2,500 spaces and 3 x 3kW connections. And lots and lots of retail parks are similar. This place needs 40, if not 100 7kW connections. Even that would only be 4% of spaces. Given a movie visit lasts 2+ hours, even 100 connections isn’t a lot. I’ve personally no need for 50kW+ units at these locations but loads of 7kW makes sense.