Hi all,

I got an MG4 in October and have been enjoying it (despite a few touch and go situations when charging apps aren’t playing ball).

I have recently started a new job which has a free charging point however for some reason my MG4 is capped at 3.2-3.3kW and can never go higher when plugged, while my friend's Polestar can get as high as 10kW.

I’ve tried two three-phase cables (returned my first as I thought it was an issue with it, the new one still had a capped charge rate at this point, but still reaches 6-7kW at other public chargers via Electroverse etc), messed with the scheduled charging setting in the app, tinkered with the in car charging settings, resetting the AC charging option etc. and had a google around and not saw too much regarding a similar issue.

Could this just be a handoff/connection issue between the free point and the car since there’s no app to handshake or something like that? As I said this is my first EV so still trying to wrap my head around things.

Any advice greatly appreciated. Thanks all.
 
Last edited by a moderator:
The MG4 has an on board inverter that works at 7 kW single phase. It sounds like the Polestar has 11kW three phase. If you plug into a three phase charge point, you can only use 1 of those phases, which results in the kW figure you see.

It is unlikely down to your cable, but the way the charge point is set up.
 
Last edited by a moderator:
I have recently started a new job which has a free charging point however for some reason my MG4 is capped at 3.2-3.3kW and can never go higher when plugged when my friends Polestar can get as high as 10kW.
The charging point delivers 16A/phase on 3 phases.

According to below, MG4s only support single phase AC charging?

 
The early LR cars supported (up to) 11kW 3-phase charging, but now it is only the ER that supports that ... all other models are (up to) 6.6kW single phase.
 
To put it simply, it sounds like it's a 11kW, 3 phase charger, the MG4 can only use one phase, 11/3 = 3.7kW
 
Do you see the charge rate change when you change the AC charge setting, as it does in the video below (time stamp 9:30 onwards)

 
Do you see the charge rate change when you change the AC charge setting, as it does in the video below (time stamp 9:30 onwards)


Yes, everything shown here appears on mine.

Sounds like it’s just the way the charger is set up then. A bit disappointing as it is as slow as molasses and there’s only two chargers so I’m a bit of a hog trying to recoup the 30% it takes for a round trip 😂

Even more so by the sounds like an older LR would have gave me at least 7kW.

Oh well, thanks all!
 
Makes me wonder why manufacturers don't do away with on board chargers and just have a simple DC port.
It would save a decent amount of weight, space and cost . Home chargers would be more expensive with the step up transformer and rectifier it would need but I can't see it being prohibitive, electronic components have never been cheaper.
Having a cable with 400v DC running through it at someone's home might be the reason they shy away from it I guess :unsure:
 
If your new bosses were amiable ,would they consider installing some 7kW EVSEs at single phase as that is more the norm in the UK, especially as more and more people are turning to EVs. Grants and subsidies may be available?
 
Last edited by a moderator:
My 2023 MG4 trophy is hooked up in my garage to a Heidelberg Wallbox, maximum 11kW and I charge every time at 9.4 kW.
 
Last edited by a moderator:
hooked up in my garage to a Heidelberg Wallbox, maximum 11kW and I charge every time at 9.4 kW.
The car reports power into the battery after losses and 12 V loads. The on-board charger is rated at something less than 16.0 A per phase AC-in, so depending on your mains voltage, you may only be drawing 10.0-10.5 kW from the wall.

The Wallbox and the car are both trying to be careful not to exceed the 16 A current limit, so they will be erring on the low power side.

There will be some 700 W losses in the on-board charger, another 100 W in house wiring, and roughly 300 W used by the 12 V system for charging the 12 V battery, DC-DC losses, pumps, fans, computers, and so on. So that's over a kilowatt difference between the distribution box power and the HV battery power.

So this is not unexpected.
 
Just my understanding … Mg4 does 1 phase only. 1 phase at 32 amp is 6kw, but 16 amp would be half that. A lot of electricians dont realise (or cheap out?) and install home chargers with 16 amp fuses. You've got to insist on a 32amp fuse
Edit: and the charger needs to support 32 amp
 
A lot of electricians dont realise (or cheap out?) and install home chargers with 16 amp fuses. You've got to insist on a 32amp fuse
And of course you need the cable rated for that current too, and that's the expensive part (more copper). 11kW is 230V x 16A x 3 phase, so for an 11kW EVSE and car, you need 20A cable and breakers, because you have to derate to 80% of rated current when the load is continuous and long term, as EV charging is.

For single phase, the cable needs to be rated for 40A (6 mm²), and of course breakers also 40A.
 

Are you enjoying your MG4?

  • Yes

    Votes: 908 77.7%
  • I'm in the middle

    Votes: 171 14.6%
  • No

    Votes: 90 7.7%
Support us by becoming a Premium Member

Latest MG EVs video

MG Hybrid+ EVs OVER-REVVING & more owner feedback
Subscribe to our YouTube channel
Back
Top Bottom