Mark Holmes
Prominent Member
Hi all,
I thought I share this information with you; don’t know what use it is, but you may or may not be interested anyway. (Photo’s below to support my account).
Today I completed a 250 mile work road trip to Brentwood, Ipswich, Bury St Edmonds, Milton Keynes and then home again...mostly motorways with a speed of 65 - 70 Mph. Conditions not great 2 degrees and wind and rain. My total distance average reached 3 miles per KWh on this trip.
Started fully charged with predicted range in (N) of 191 miles with no heater and 162 miles with the heater on, however after 100.2 miles I needed to charge as only 22 miles remaining in (E) or 21 miles in (N) remaining with heater on, this is about what I expected in these conditions and glad it wasn’t worse.
My average since the Comfort 2 installation is still 4.1 miles / KWh over the last 6346 miles.
Charging update.
1st charge with GeniePoint was slower than I ever experienced before 1 hour and 28 mins for 29.49 KWh
2nd charge with BP pulse at Milton Keynes was better 41 mins for 24.4 KWh.
I don’t know if the above is useful or insightful, but hopefully it is to some.
I thought I share this information with you; don’t know what use it is, but you may or may not be interested anyway. (Photo’s below to support my account).
Today I completed a 250 mile work road trip to Brentwood, Ipswich, Bury St Edmonds, Milton Keynes and then home again...mostly motorways with a speed of 65 - 70 Mph. Conditions not great 2 degrees and wind and rain. My total distance average reached 3 miles per KWh on this trip.
Started fully charged with predicted range in (N) of 191 miles with no heater and 162 miles with the heater on, however after 100.2 miles I needed to charge as only 22 miles remaining in (E) or 21 miles in (N) remaining with heater on, this is about what I expected in these conditions and glad it wasn’t worse.
My average since the Comfort 2 installation is still 4.1 miles / KWh over the last 6346 miles.
Charging update.
1st charge with GeniePoint was slower than I ever experienced before 1 hour and 28 mins for 29.49 KWh
2nd charge with BP pulse at Milton Keynes was better 41 mins for 24.4 KWh.
I don’t know if the above is useful or insightful, but hopefully it is to some.
Attachments
-
2E93D045-583C-41C4-9383-B85C17E8A5A1.jpeg432.2 KB · Views: 188
-
C6D19648-D9B1-46E0-A0B5-E1E41183D570.png739.6 KB · Views: 159
-
BB8EDAF9-A904-4994-9726-E64BFFB6226A.jpeg415.1 KB · Views: 162
-
D18D4ECB-5A87-4D9C-9A09-D9669EB686C8.jpeg345.7 KB · Views: 158
-
C15EE267-998C-4717-8E72-E4ED12418E95.jpeg307.1 KB · Views: 156
-
FABFD781-9B86-44FA-82D1-EE4CF9697AA4.jpeg413.3 KB · Views: 177
-
18BC0104-F8A9-4ADE-993A-0D30E129710C.jpeg349.7 KB · Views: 145
-
87F13EEE-9AFC-48D9-B103-5C80D57FAAC1.jpeg349.4 KB · Views: 149